Notice of construction - Eighth Line slope stabilization: Sep 25 - Oct 6

Posted on Thursday August 31, 2017

From Monday, September 25, 2017 - Friday, October 6, 2017, the Town of Milton’s contractor (R&M Construction) will be rehabilitating the creek (tributary to Sixteen Mile Creek) and slope along the east side of Eighth Line, approximately 550 metres north of East Lower Base Line.

The scope of work includes earth and channel work, slope stabilization, tree protection, plantings and minor shoulder work. There may be a lane closure during working hours; however, one lane of traffic will be maintained at all times, and two lanes of traffic at all times outside of working hours. Significant impacts are not expected to traffic on Eighth Line during this work.

 
The work schedule is subject to change due to weather and construction scheduling.  For updates, visit www.milton.ca/roads and our Facebook and Twitter feeds.

For a map, see the attached notice.

For more information, please contact:
 
Diana Jiona, P. Eng.  
Coordinator, Infrastructure  
Engineering Services, Town of Milton
150 Mary Street, Milton ON  L9T 6Z5
905-878-7252 x2513