Curb Cut and Entrance Permit

You need a curb cut and entrance permit before you make any modifications to an existing driveway entrance or construction of a new entrance within the Town of Milton's road allowance.

A warning clause is registered on title for all lots within subdivisions registered after the year 2000 prohibiting these modifications. There is no exception or appeal process for this.

Who this is for 

This permit is for: 

  • Homeowners modifying an existing driveway 

  • Property owners building a new driveway entrance 

  • Contractors applying on behalf of a property owner 

Before you apply 

Before submitting your application, review these important requirements and restrictions. 

Eligibility and restrictions 

  • Subdivision limitations: Properties in subdivisions registered after 2000 may have a clause on title that prohibits driveway changes. There are no exemptions or appeal options. 

  • Regional roads: The Town does not issue permits for entrances on Regional roads. You must confirm the road authority before applying. 

  • Asphalt overlay program: Permits are not issued for properties within active asphalt overlay areas. Applications will be cancelled or deferred to the next year. 

Location and design requirements 

  • Driveways must maintain a minimum 1.2 m clearance from utilities and municipal infrastructure such as hydrants, street trees, and streetlights. 

  • Site conditions, including visibility and obstructions, are reviewed before approval. 

Timing considerations 

  • Entrance construction is permitted between April 1 and Oct. 31. 

  • Applications outside this window may be deferred. 

  • Applications submitted close to the end of the season may be deferred at the Town’s discretion.

What you need 

To apply, you will need: 

  • Property and location details 

  • Description of proposed entrance changes 

  • Contractor information (if applicable) 

  • Proof of insurance 

Insurance 

Applicants must provide a valid certificate of insurance (COI) that meets the Town’s requirements. 

  • Must be satisfactory to the Town 

  • Must name The Corporation of the Town of Milton as additional insured and certificate holder 

  • Must describe the operations and location of the work 

  • Minimum $5 million Commercial General Liability per occurrence, including: 

    • Bodily injury, including death

    • Property damage

    • Employer’s liability 

  • Must include cross liability and severability of interests clauses 

  • Must include non-owned automobile insurance and automobile liability insurance 

  • Must provide 30 days written notice of cancellation or material change 

  • Must be signed by an authorized insurance agent in Ontario 

How to apply 

Follow these steps to request a curb cut and entrance permit: 

  1. Confirm your property is eligible and not restricted by subdivision or program limitations. Please contact Licencing and Permits.

  1. Verify the road jurisdiction (Town vs. Regional). 

  1. Prepare your application details and supporting information. 

  1. Pay the required application fee. 

  1. Allow time for review, site inspection and any follow-up requirements. 

Fees 

All applications are subject to a non-refundable review fee. Approval is not guaranteed.  

Fees are established by the Town’s User Fees By-Law. 

  • Additional inspection or construction costs may apply based on review 

Processing time 

Processing times may vary depending on the complexity of your application and whether additional approvals are required. 

  • Minimum 10 business days for initial review 

  • Additional time may be required if more information is needed 

  • In general, allow up to 30 business days for permit issuance
     

After you apply 

Once your application is submitted: 

  • Town staff will review your submission for completeness and compliance 

  • A site visit may be required to assess constructability and clearances 

  • Staff will contact you if additional information is needed 

  • If approved, you will receive instructions to proceed with the work 

Town standards 

All entrance work must meet Town standards, including engineering and right-of-way requirements. These standards are defined in applicable Town manuals and by-laws and may be updated over time. 

Refer to the Town of Milton Zoning By-law for maximum driveway widths and design criteria. 

Related services 

Contact Engineering and Infrastructure