Construction notice

The Town of Milton’s 2023 asphalt sealing program is running throughout the month of June. Asphalt sealing enhances the performance of the road’s surface, lowering lifecycle service costs. Subcontractor Superior Road Products will be applying an in-depth asphalt seal to various streets in the community.

Please note:

Residents may experience a short interruption to driveway access (crew members can assist)

Follow all signs and flag person's directions

Sand cover will be swept up within one hour after sealing (weather permitting)

Use caution when driving on loose sand

Drive slowly (5km) if you accidentally enter a freshly treated area that has not been sanded - sealer can be removed from a vehicle with a pressure washer and degreaser soap

Keep children and pets out of treated areas to avoid tracking into houses

Material tracked on driveways will weather off within a few weeks

Lane restrictions will occur daily in the affected construction areas

Traffic delays are expected

Investing in the Roads to Possibility 

The Town of Milton is investing in community infrastructure to make your travel safe and accessible. We thank you for your patience. During construction, the public is encouraged to plan travel in advance, consider alternate routes, follow signage and be patient while traveling in and around construction areas.

Town-led construction is essential municipal work to ensure Milton’s infrastructure remains safe, in state of good repair and able to meet the community’s needs now and in the future. For more information about the project and road closures throughout the Town, visit our road construction page.