Construction notice
The Town of Milton’s semi-annual program extends the service life of municipal bridges and culverts.
Planned enhancements include:
-
Concrete repairs to bridge components on the surface and underside
-
Repairs and replacement of asphalt, curbs and sidewalks adjacent to the structures
Location
Structure 13 – Conservation Road, 200 metres west of McNiven Road.
Structure 47 – McGeachie Drive, 500 metres west of Harrop Drive.
Structure 62 – 25 Side Road, 100 metres west of Guelph Line.
Structure 110 – Second Line Nassagaweya, 1.3 km south of 20 Side Road.
Structure 115 – Main Street East, 50 metres west of James Snow Parkway.
Schedule
Start Date: July 7, 2025
Completion: Fall 2025
Construction timelines are dependent on many factors, including weather.
Road Closures
Three separate road closures will be required to complete the work:
-
Structure 13
-
Structure 62
-
Structure 110
Lane restrictions only will be in effect for:
-
Structure 47
-
Structure 115
Local residents and businesses will receive individual road closure notices if directly affected.
All road closures can be found using our interactive road closure map at milton.ca/RoadClosures.
Investing in the Roads to Possibility
The Town of Milton is investing in community infrastructure to make your travel safe and accessible. We thank you for your patience. During construction, the public is encouraged to plan travel in advance, consider alternate routes, follow signage and be patient while traveling in and around construction areas.
Town-led construction is essential municipal work to ensure Milton’s infrastructure remains safe, in state of good repair and able to meet the community’s needs now and in the future.
For more information about the project and road closures throughout the Town, visit milton.ca/roads.
Contact Us