Construction notice
This project will improve road safety by installing speed cushions and cushioned cross walks at multiple locations across town.
Schedule
Start: July 2026
Completion: August 2026
Locations
Multiple locations including;
Speed Cushions:
- Armstrong Boulevard between Derry Road and Bennett Boulevard
- Etheridge Avenue between Bronte Street South and Regional Road 25
- Woodward Avenue between Ontario Street North and Thompson Road North
Speed Cushions on either side of Pedestrian Crossover (PXO):
- 625 Sauve Street and Pathway
- Bennett Boulevard and Hepburn Road
- Bennett Boulevard and Lee’s Gate
- Dixon Drive and Hatton Crossing
- Farmstead Drive and Duignan Crescent
- Leger Way and Hinton Terrace
- Tupper Drive and 201 Bussel Crescent
- Whitlock Avenue and Hazel Way
- Whitlock Avenue and Mulroney Heights
Raised Crosswalk Locations:
- 320 Coxe Boulevard and Pathway
- 709 Bolingbroke Drive and Pathway
- 745 Farmstead Drive and Pathway
- 829 Farmstead Drive and Pathway
- Bennett Boulevard and Wickson Way
- Bronte Street South and Etheridge Avenue (North Leg)
- Bronte Street South and Etheridge Avenue (South Leg)
- Bronte Street South and Whitlock Avenue (North Leg)
- Bronte Street South and Whitlock Avenue (South Leg)
- Dixon Drive and Cobban Road
- Dixon Drive and Sprucedale Lane
- Kennedy Circle West at Cedar Ridge Elementary School
- Louis St Laurent Avenue and Kennedy Circle East (East Leg)
- Louis St Laurent Avenue and Kennedy Circle East (West Leg)
- Savoline Boulevard and Merkley Gate
- Savoline Boulevard and 336 Nunn Court
- Savoline Boulevard and Union Gas Trail
- Scott Boulevard and Athlone Drive
- Scott Boulevard and Farrington Crossing/Baylis Court
- Tupper Drive and 545 Bussel Crescent
- Woodward Avenue and Robarts Drive/Galbraith Boulevard
- Yates Drive and Lott Crescent
- Yates Drive and Symons Crossing
Road closures
While no full road closures are required to complete this project, localized lane closures will be required to complete work. One lane of traffic will be maintained at all times.
Dates are subject to change based on weather and construction conditions, and any updates will be available using our interactive road closure map.
Investing in the Roads to Possibility
The Town of Milton is investing in community infrastructure to make your travel safe and accessible. We thank you for your patience. During construction, the public is encouraged to plan travel in advance, consider alternate routes, follow signage, and be patient while traveling in and around construction areas.
Town-led construction is essential municipal work to ensure Milton’s infrastructure remains safe, in state of good repair and able to meet the community’s needs now and in the future. For more information road closures throughout the Town, visit our road construction page.
Contact Us